Dan and John got a lot done today. I showed them the design for the arches I came up with and Dan thought it would be fine. I think it will look nice when it's done but it does take a bit of imagination at this point to picture it. I just hope it's not too much of a hassle for them to make it work...it does seem like it may be.
They got busy right away drilling holes and running wire for the sub-panel in the utility room. Dan also got us to rethink the placement of our future kiln. Rather than have it out in the open in the basement near the storage closet, we're going to have it set up in the utility room. That makes sense in so many ways. First, it allows us to have a run of less than 50 feet from the outside panel to the kiln which is what is recommended. Second, any fumes created will easily be vented outside and not into any of our living areas and lastly, it's not sitting taking up space in the finished part of our basement.
I was hoping to get off work tomorrow so I could meet with Dan and go over the placement of the overhead lighting and switches. It's not looking good for taking the day off so when I got home tonight Tammy and I spent some time in the basement making a list for Dan of where we'd like stuff. I'll give him a call in the morning and see if he needs any more input.
Monday, November 8, 2004
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment